An AI agent for project management: a status report and a re-plan.

An AI agent for project management should tell you where a project really stands and fix the plan, not only summarize it. Elena read an 18-task relaunch sheet and, in 34.1 seconds, wrote a status report as a doc and re-planned the four tasks that needed it on their own rows. Eight of our nine checks passed.

The agent who did it

Elena works in the Agency and Consulting rooms.

The prompt

Send it to Elena
Write a status report on the website relaunch as a doc, from the Relaunch tasks sheet: what is done, what is late, what is blocked and why, anything in the sheet that does not add up, and who is carrying the most open work. Then re-plan: on every task that is late, blocked or not really done, record a New due date and a one-line Reason on its row, never earlier than today and never before the tasks it depends on. Say whether the launch on December 15 still holds.

The 18 tasks are an invented company's website relaunch, written so the right answer is fixed in advance: two tasks are late, one is blocked, one is marked Done although the three builds it checks are unfinished, and one has no owner. The run was on Monday, November 23, 2026.

DatabaseRelaunch tasks
18 rows
Analytics and trackingAnaDone2026-11-138
Brief the support teamPriyaNot started2026-12-088Write help articles
Build checkout flowJonasIn progress2026-12-0440Visual design
Build homepageJonasIn progress2026-11-2720Visual design; Write homepage copy
Build pricing pageJonasBlocked2026-11-3012Final pricing approved
Final pricing approvedPriyaNot started2026-11-252
Kickoff and scope sign-offPriyaDone2026-11-024
LaunchPriyaNot started2026-12-152QA on staging; Set up redirects; Launch email
Launch emailLenaNot started2026-12-114Final pricing approved
Partner announcementPriyaNot started2026-12-106Final pricing approved
Product photosSamNot started2026-11-2012Visual design
QA on stagingAnaDone2026-12-0916Build homepage; Build pricing page; Build checkout flow
Set up redirectsNot started2026-12-076Sitemap and page list
Sitemap and page listPriyaDone2026-11-066Kickoff and scope sign-off
Visual designMeiDone2026-11-1724Wireframes
WireframesMeiDone2026-11-1116Sitemap and page list
Write help articlesPriyaNot started2026-12-0412Build checkout flow
Write homepage copyLenaIn progress2026-11-1810Sitemap and page list
The 18 tasks Elena was given: an invented website relaunch, one row each, with its owner, status, due date, estimate and what it depends on.

What came back

One message, 34.1 seconds to Elena's reply. She kept the report as a doc in the workspace and added two columns to the sheet, New due date and Reason, filled on the four tasks she re-planned. The sheet still has 18 rows.

ChatChat with Elena
  1. Yousent

    Write a status report on the website relaunch as a doc, from the Relaunch tasks sheet: what is done, what is late, what is blocked and why, anything in the sheet that does not add up, and who is carrying the most open work. Then re-plan: on every task that is late, blocked or not really done, record a New due date and a one-line Reason on its row, never earlier than today and never before the tasks it depends on. Say whether the launch on December 15 still holds.

  2. ElenaProject Manager+34.1 s

    I created the Website Relaunch Status Report doc. It covers completed, late and blocked work; the sheet inconsistencies; open workload by owner; and the revised dates and reasons recorded on the affected task rows.

    December 15 is still possible, but it’s a conditional, at-risk target with little buffer. The key watchouts are confirming redirects has an owner, balancing Jonas’s 72 estimated open hours, and rerunning QA after the builds are complete.

    Created: Website Relaunch Status Report

The message and Elena's reply, as saved.
PageWebsite Relaunch Status Report

Website Relaunch Status Report

Executive summary

The December 15 launch is still achievable, but it is at risk and has little schedule slack. The sheet shows six tasks marked Done, one blocked task, and two overdue tasks. A critical data-quality issue makes the current completion picture unreliable: QA is marked Done even though three tasks it depends on are still in progress or blocked and are scheduled for later.

Done

Six tasks are marked Done: Kickoff and scope sign-off; Sitemap and page list; Analytics and tracking; Wireframes; Visual design; and QA on staging. Treat the QA completion as unverified until it is rerun after the build work.

Late

As of November 23, these tasks are past their original due dates and remain unfinished:

  • Write homepage copy (Lena): due Nov 18; In progress.
  • Product photos (Sam): due Nov 20; Not started.

Their revised dates and reasons have been recorded on their rows in the sheet.

Blocked and why

  • Build pricing page (Jonas): Blocked because Final pricing approved is a dependency and is not yet complete (Not started, due Nov 25). A revised date of Nov 27 is recorded, allowing two days after approval.

What does not add up

  • QA on staging is marked Done and is dated Dec 9, but it depends on Build homepage (due Nov 27), Build pricing page (due Nov 30), and Build checkout flow (due Dec 4). All three builds are still unfinished. QA cannot already be complete against work that has not yet been delivered; verify or rerun it. Its row now has a Dec 11 replanned date and a reason recorded.
  • Set up redirects has no Owner, leaving accountability unclear for a launch-critical task due Dec 7.
  • Status group classifies Blocked as “In progress,” which can hide blocked work in grouped views.
  • The sheet contains no actual completion dates, so the Done statuses cannot be checked against when work finished.

Open-work load

Based on the estimates recorded for tasks not marked Done, Jonas carries the most assigned open work: 72 hours (homepage build 20, pricing page 12, checkout flow 40). Priya has 30 assigned open hours; Lena 14; Sam 12; Ana none currently shown. Redirect setup adds 6 open hours with no owner, so the sheet's owner totals do not account for all remaining work.

Re-plan and launch outlook

Revised dates and one-line reasons are recorded for the two overdue tasks, the blocked pricing page, and the QA task whose Done status conflicts with its dependencies. No replan dates were entered for other open tasks because the sheet does not show them as late or blocked, and their dependencies do not yet require moving their current due dates.

December 15 still holds as a conditional target, not a confident commitment. It requires final pricing approval by Nov 25, the overdue copy and photos to land by Nov 25, the pricing page by Nov 27, homepage by Nov 27, checkout by Dec 4, then real QA after all builds (the proposed QA date is Dec 11). Redirects and launch email must also finish before launch. That leaves only a few days of contingency; confirm an owner for redirects, rebalance Jonas's 72 hours, and verify QA before treating the date as firm.

The doc Elena wrote and kept in the workspace.
DatabaseRelaunch tasks, re-planned
18 rows
Analytics and trackingAnaDone2026-11-13
Brief the support teamPriyaNot started2026-12-08Write help articles
Build checkout flowJonasIn progress2026-12-04Visual design
Build homepageJonasIn progress2026-11-27Visual design; Write homepage copy
Build pricing pageJonasBlocked2026-11-30Final pricing approved2026-11-27Blocked pending final pricing approval, due Nov 25; allow two days after approval.
Final pricing approvedPriyaNot started2026-11-25
Kickoff and scope sign-offPriyaDone2026-11-02
LaunchPriyaNot started2026-12-15QA on staging; Set up redirects; Launch email
Launch emailLenaNot started2026-12-11Final pricing approved
Partner announcementPriyaNot started2026-12-10Final pricing approved
Product photosSamNot started2026-11-20Visual design2026-11-25Past due and not started; visual design dependency is complete.
QA on stagingAnaDone2026-12-09Build homepage; Build pricing page; Build checkout flow2026-12-11Marked Done despite its build dependencies not yet being complete; replan QA after builds due Dec 4.
Set up redirectsNot started2026-12-07Sitemap and page list
Sitemap and page listPriyaDone2026-11-06Kickoff and scope sign-off
Visual designMeiDone2026-11-17Wireframes
WireframesMeiDone2026-11-11Sitemap and page list
Write help articlesPriyaNot started2026-12-04Build checkout flow
Write homepage copyLenaIn progress2026-11-18Sitemap and page list2026-11-25Past due and still in progress; reset after its completed sitemap dependency.
The same sheet after Elena: a new due date and a reason on the four tasks she re-planned, and still 18 rows.

Rendered from what Claos saved on November 23, 2026: the messages, pages, tasks and rows are copied from the run, not retyped.

How Claos did against the answer we wrote first

8 of 9 right. Choose a line to see where it is in what came back.

What to check

  • Follow a blocker all the way down. Elena named the pricing approval as what blocks the pricing page, but two more tasks wait on it (the launch email and the partner announcement), and the report does not say so. Read the Depends on column for anything a late or blocked task feeds.

  • It re-plans only what you ask it to. The four rows it moved are exactly the late, blocked and not-really-done tasks; the build homepage task, which depends on the late copy, kept its date because the new copy date still fits. If you want the whole plan moved, say so.

  • "Holds" is conditional. The report says the launch date holds only if the pricing approval, the copy and the photos land by November 25 and someone takes the redirects. Those conditions are the plan; put them on the right people.

Run it yourself

  1. Import your project's tasks as a sheet: one row per task, with its owner, status, due date, an estimate and the tasks it depends on.

  2. Open Elena, the Project Manager, from the Agency room, and send the prompt with your own launch date.

  3. Read the report beside the sheet's New due date and Reason columns, then move the dates you agree with into Due.

The same job in ChatGPT, Claude, Gemini and Grok

Not compared yet. This job joins the next comparison pass, when the same prompt and the same data, as a file, go to ChatGPT, Claude, Gemini and Grok; this section will show what each did.

Without an AI

Sort the sheet by due date, filter for open tasks before today, and read the Depends on column for each one; that finds the late and blocked work in a few minutes on 18 tasks. Totalling the open estimate hours per owner is a pivot table. What takes longer by hand is catching a task marked Done that cannot be, and re-dating tasks in dependency order without missing one, which is where a checked run earns its place.